PROJECT DESCRIPTION:
Performance of Multibeam, Side-Scan and magnetometer surveys of the future site for Long Beach's Pier S terminal along the Cerritos Channel.
GBA SERVICES:
- Performed Multibeam, Side-Scan and Magnetometer Surveys.
- Located Debris that Would Impede Dredging Operations.
- Project Demonstrated the Need to Perform Geophysical Surveys in Addition to the Standard Bathymetric Surveys Prior to Executing Any Dredging Operations.
- Combined the Side-Scan Data with the Multibeam surface to Produce a 3 Dimensional Side-Scan Image.
CLIENT:
DMJM Harris
3800 Kilroy Airport Way, Suite 350
Long Beach, CA 90801