GBA coastal engineering | Gahagan & Bryant surveyors
|
Login
  • Home
  • +About Us
    • Senior Team Members
  • +Services
    • Navigation Channel Design
    • Dredging Engineering
    • Beneficial Use of Dredged Materials
    • Agency Coordination
    • Hydrographic Surveying
    • Coastal Engineering
    • Construction Management
  • Projects
  • News
  • Careers
  • Contact Us
GBA coastal engineering | Gahagan & Bryant surveyors
  • Home
  • About Us
    • Senior Team Members
  • Services
    • Navigation Channel Design
    • Dredging Engineering
    • Beneficial Use of Dredged Materials
    • Agency Coordination
    • Hydrographic Surveying
    • Coastal Engineering
    • Construction Management
  • Projects
  • News
  • Careers
  • Contact Us
|
Login

Projects

Prev Next Pier J Expansion

  • Piers
  • View Count 3116
  • Return
  • Pier J Expansion

    Pier J Expansion

PROJECT DESCRIPTION:

Rock was barged from a quarry on Catalina Island and placed in position in 55 feet of water, forming a pyramid-like dike (over 12,000 lineal feet in length and 70 feet in height). The enclosed area was filled with 13,750,000 cubic yards of dredge material to form 147 acres of new land area in Long Beach Harbor.

GBA SERVICES:

  • Performed Hydrographic Surveys for all Phases of the Project.
  • Retained by the Port of Long Beach to Continue to be of Assistance to them in their Hydrographic & Engineering Needs on an "as Needed" Basis.

CLIENT:

Port of Long Beach 
PO Box 570
Long Beach, CA 90801

Copyright 2023 by GBA-Inc | Privacy Statement | Terms Of Use | Powered by QuickSocial